Local Issues — Kalat Division

Since Kalat Division comprises six districts—Kalat, Khuzdar, Lasbela, Mastung, Surab, and Awaran—we examine the key development challenges facing each district. We also outline the government’s ongoing initiatives and planned interventions to address these issues and promote balanced regional development.

Kalat District Issues

Kalat District (population approx. 271,560; 2023 census) is a historical and geographical anchor of the division. Situated in an arid, high-altitude zone, its economy relies heavily on agriculture, livestock, and trade along the main highway corridors.

1. Water Scarcity and Agriculture

  • Depleting Groundwater: Over-reliance on electric tube wells for apple, peach, and wheat farming has led to a critical drop in the water table. Traditional karez (underground canal systems) have largely dried up.
  • Drought Vulnerability: Frequent dry spells severely affect both crop yields and livestock pasturage, which form the primary rural safety net.

Government Response: Balochistan Public Sector Development Programme (PSDP) initiatives focus on constructing check dams, delay-action dams, solarizing tube wells, and promoting micro-irrigation systems.

2. Transport & Infrastructure Gaps

  • N-25 Highway Bottlenecks: The Karachi–Quetta Highway (N-25) passing through Kalat sees heavy transit traffic but suffers from single-carriageway hazards and high accident rates.
  • Off-Grid Rural Settlements: Many remote tehsils (e.g., Gazg, Johan) lack paved road links, severely restricting access to basic markets.

Government Response: Dualization of the N-25 highway (the "Bloody Highway" project) under federal-provincial collaboration, along with provincial PSDP farm-to-market road rehabilitation.

3. Health and Education

  • Primary Facility Shortages: Literacy stands at roughly 39.7%. Over 80% of government schools operate only at the primary level, leading to high drop-out rates after class 5 (especially for girls).
  • Healthcare Access: Secondary care facilities in Kalat urban center face staff shortages and lack specialized emergency care, forcing patients to travel to Quetta.

Government Response: Upgradation of primary schools to middle/high status, teacher recruitment drives, and equipment provision for District Headquarters (DHQ) Hospital Kalat.

Khuzdar District Issues

Khuzdar District (population approx. 997,214; 2023 census) is the most populous district and the administrative headquarter of Kalat Division. It serves as a major trade nexus connecting Sindh, Balochistan, and CPEC transport routes.

1. Urban Infrastructure and Municipal Pressure

  • Sanitation & Drainage: Rapid urban expansion in Khuzdar city has outpaced municipal capacities, causing severe solid waste accumulation and inadequate sewage drainage.
  • Power & Water Supply: Urban drinking water distribution is irregular, while rural tehsils like Aranji and Wadh face acute potable water shortages.

Government Response: Urban bulk water supply schemes, municipal sanitation upgrades, and electrification schemes funded via Balochistan PSDP.

2. Connectivity in Remote Tehsils

  • Vast Distances: Khuzdar spans over 35,000 km². Outlying tehsils (e.g., Aranji, Karakh, Moola) remain isolated due to unpaved dirt tracks, making travel to the district center difficult during rains.

Government Response: Construction of the Khuzdar–Ratodero highway (M-8) feeder links, regional asphalt roads, and bridge installations over seasonal rivers.

3. Education, Health & Mineral Potential

  • Low Rural Literacy: While urban Khuzdar has colleges and the Balochistan University of Engineering and Technology (BUETK), rural areas struggle with low literacy (e.g., Aranji Tehsil at ~12.1%).
  • Resource Realization: Rich in minerals (barite, chromite, marble), Khuzdar lacks organized processing facilities and local value-addition plants.

Government Response: University expansion, establishment of medical/technical institutes, and incentives for mineral-processing industrial zones.

Mastung District Issues

Mastung District (population approx. 312,917; 2023 census) lies directly south of Quetta. It is a vital agricultural belt famous for horticulture (apples, almonds, grapes) but faces intense resource pressure.

1. Groundwater Crisis & Agricultural Power Supply

  • Critical Water Table Decline: Unrestricted tube-well pumping for high-water-consuming fruit orchards has dropped groundwater levels to alarming depths.
  • Load-Shedding Disruptions: Agricultural feeders face prolonged power outages, disrupting irrigation schedules and threatening crop yields.

Government Response: Subsidized solar-powered tube well conversion schemes by the provincial government, along with water conservation extension services.

2. Law & Order and Highway Safety

  • Security & Transit Vulnerabilities: Located along sensitive transit routes, Mastung has historically experienced security incidents affecting public safety and trade.
  • Traffic Hazards: Heavy freight traffic moving between Quetta and Karachi creates frequent congestion and accidents on single-lane stretches.

Government Response: Security infrastructure strengthening, enhanced highway patrolling, and inclusion in the N-25 dualization roadmap.

3. Social Sector Infrastructure

  • School & Clinic Conditions: Basic health units (BHUs) suffer from doctor absenteeism and lack of essential medicine supplies, while rural schools face structural deficiencies.

Government Response: Strengthening of DHQ Hospital Mastung, conversion of schools to solar power, and targeted social safety initiatives.

Awaran District Issues

Awaran District (population approx. 178,958; 2023 census) is one of Balochistan's most remote, sparsely populated, and historically underdeveloped districts.

1. Extreme Isolation and Road Connectivity

  • Lack of Paved Highways: Settlements across Awaran, Mashkay, and Jhal Jhao are separated by rugged terrain with few paved highways. Access to regional trade hubs takes hours over rough dirt tracks.
  • Communication Deficits: Telecommunication and mobile network coverage remain spotty across vast stretches of the district.

Government Response: Construction of the Awaran–Naal road, Awaran–Bela road, and integration into southern Balochistan development packages.

2. Post-Disaster & Poverty Challenges

  • Earthquake Recovery Gaps: Long-term socioeconomic recovery continues following the major 2013 earthquake that devastated housing and public facilities.
  • Subsistence Economy: Pastoralism and small-scale rainfed agriculture are the only livelihoods, creating extreme exposure to dry spells.

Government Response: Awaran reconstruction housing packages, livestock vaccination drives, and targeted cash transfer programs (BISP/Ehsas).

3. Education and Healthcare Shortages

  • Functional School Shortages: High rates of non-functional or shelterless schools due to teacher shortages and geographical dispersion.
  • Maternal Care Deficits: Rural BHUs lack female healthcare personnel and emergency obstetric facilities, requiring travel to Karachi or Khuzdar.

Government Response: Hard-area allowance incentives for doctors/teachers, mobile health units, and school construction under provincial development schemes.

Lasbela District Issues

Lasbela District (population approx. 681,273; 2023 census) is the industrial and coastal gateway of the division, sharing borders with Sindh and the Arabian Sea.

1. Industrial Infrastructure and Utilities

  • Hub & Uthal Industrial Strain: Industrial zones (Hub, Winder, Uthal) face power shortages, industrial water scarcity, and insufficient effluent treatment plants.
  • Environmental Pollution: Chemical and manufacturing waste disposal poses environmental and health concerns for surrounding communities.

Government Response: Lasbela Industrial Estates Development Authority (LIEDA) upgrading projects, combined effluent treatment plant proposals, and industrial power feeder dedicated lines.

2. Water Resources & Coastal Livelihoods

  • Potable Water Scarcity: Despite proximity to Hub Dam, rural settlements and coastal towns suffer from freshwater shortages due to siltation and allocation priority to Karachi.
  • Fishermen Livelihoods: Coastal communities (Sonmiani, Gadani) face challenges from illegal deep-sea trawling and inadequate jetties/cold storages.

Government Response: Desalination plant projects, Hub Dam canal rehabilitation, construction of landing sites, and fisheries support packages.

3. Urban-Rural Disparity

  • Service Inequality: While towns closer to the Karachi border enjoy higher commercial activity, northern interior tehsils (e.g., Kanraj, Liari) face extreme poverty, low literacy, and poor roads.

Government Response: Rural road networks, upgraded rural health centers (RHCs), and vocational training centers through LIEDA.

Surab District Issues

Surab District (population approx. 279,038; 2023 census) was carved out of Kalat District to improve local governance. It is an agricultural and transit-dependent district located at the junction connecting Khuzdar, Kalat, and Panjgur.

1. Infrastructure for a New Administrative District

  • Institutional Gaps: As a relatively young district, Surab faces administrative infrastructure deficits—lacking complete complex buildings, district-level courts, and fully equipped administrative officers' setups.
  • Basic Municipal Services: Surab town requires organized urban planning, clean drinking water schemes, and formal municipal waste management.

Government Response: Special allocations in the Balochistan PSDP for establishing District Complex buildings, judicial complexes, and municipal infrastructure.

2. Agriculture and Tube-Well Reliance

  • Drying Aquifers: Agriculture (apples, onions, wheat) relies entirely on deep tube wells. Groundwater depletion is a growing threat to long-term farming sustainability.
  • Market Access: Farmers face volatile produce prices and a lack of local cold storage facilities, forcing quick sales to middlemen.

Government Response: Solarization schemes for agricultural pumps, encouragement of water-efficient drip irrigation, and cold-storage subsidy proposals.

3. Healthcare and Education Infrastructure

  • Healthcare Upgrades: The main health center needs expansion to function as a full-fledged District Headquarters Hospital with surgical and emergency departments.
  • Literacy & Facilities: Overall literacy stands at ~37.4%. Secondary schools require science laboratories, boundary walls, and functional toilets.

Government Response: DHQ Hospital construction/upgradation, school basic facility provision projects under the provincial education sector plan.

In short — Kalat Division’s district issues cluster around two axes: a province-wide, currently acute groundwater/drought crisis (Kalat, Khuzdar, Mastung, and by extension Surab), and a near-total absence of formal industry outside Lasbela, where the challenges shift instead to energy shortages, smuggling, and regulatory gaps. Awaran stands apart with security/insurgency as its dominant issue rather than economic underdevelopment alone.

Chat with Us